The Hamilton, Albury.

Watters Electrical was involved in the installation of a 750KVa 22KV transformer supplying power to a 1000A rated site main switchboard.

The premises included supply authority meter panels, common area light and power boards along with four retail space switchboards and thirty independent living unit switchboards.

All the unit switchboards were separately metered along with an NBN connection to each unit. Every unit was fitted with free to air television as well as MATV capability.

A fully integrated video intercom system was included in the premises to marry into the access control system to allow entry to the building as well as each unit.

A CCTV system was included in the design along with a 1670.1 compliant fire system.

A 30KW PV system was install on the roof to offset the common area electrical demands.

Solar/Electrical Hardware Installed

  • Installation of Consumer Mains, Sub Mains & associated Underground Cabling Works.
  • Installation of Site Main Switchboard (Site MSB).
  • Installation of Distribution Boards.
  • Installation of Interior & Exterior General Lighting.
  • Installation of Emergency & Exit Lighting.
  • Installation of General Power Outlets, Lighting Switches & Floor Outlet Boxes.
  • Installation of Power Sub-circuits Cabling to Mechanical Equipment Isolators.
  • Installation of Fire Detection & Occupant Warning System.
  • Installation of Data & Communications System Cabling & Outlets.
  • Installation of NBN Lead-in Conduits, Cable Paths & Network Termination Devices (NTDs).
  • Installation of MATV/SMATV System Cabling, Distribution & Headend Equipment.
  • Installation of Access Control System.
  • Installation of Video Intercom System.
  • Installation of Closed-Circuit Television System (CCTV).
  • Installation of Solar Photovoltaic Power Generation System.

Project Information

Start Date
January 2020

Completion Date
December 2020

Project Type
Commercial Electrical

Location
Albury, NSW, Australia