skip to Main Content

Skate & Recreation Hub Albury

Skate & Recreation Hub Albury 1
Skate & Recreation Hub Albury 1
Skate & Recreation Hub Albury 2
Skate & Recreation Hub Albury 1Skate & Recreation Hub Albury 2

Recreation Hub Albury

Watters supplied & installed the following;

  • Supply & Install of underground pit and conduits infrastructure.
  • Supply & Install seven 12 meter led pole lights around the new skate hub area.
  • Supply & Install nine high bay light fittings within the shelter areas.
  • Supply & Install six led flood lights of the large shelters.
  • Supply & Install two vandal proof led fluorescent light fittings within the small shelter area.
  • Supply & Install lighting control.
  • Supply & Install two 15-amp power point within the switchboard cabinet.

Solar and Electrical Hardware Installed

  • New Load centre
  • Lighting Control
  • LED light poles
  • LED high bay lights
  • LED flood lighting
  • Solar LED path lighting
  • General Power Points

Project Information

Start Date
02/02/2021

Completion Date
08/10/2021

Project Type
Commercial

Location
Recreation Hub, Albury, Australia

Back To Top