Watters supplied & installed the following;
- Supply & Install of underground pit and conduits infrastructure.
- Supply & Install seven 12 meter led pole lights around the new skate hub area.
- Supply & Install nine high bay light fittings within the shelter areas.
- Supply & Install six led flood lights of the large shelters.
- Supply & Install two vandal proof led fluorescent light fittings within the small shelter area.
- Supply & Install lighting control.
- Supply & Install two 15-amp power point within the switchboard cabinet.
Solar and Electrical Hardware Installed
- New Load centre
- Lighting Control
- LED light poles
- LED high bay lights
- LED flood lighting
- Solar LED path lighting
- General Power Points
Project Information
Start Date
02/02/2021
Completion Date
08/10/2021
Project Type
Commercial
Location
Recreation Hub, Albury, Australia