Shepparton Solar & Battery Installation

Shepparton Solar & Battery Installation
Shepparton Solar & Battery Installation
Shepparton Solar & Battery Installation 2
Shepparton Solar & Battery Installation 3
Shepparton Solar & Battery InstallationShepparton Solar & Battery Installation 2Shepparton Solar & Battery Installation 3

Shepparton Solar & Battery Installation

This customer was building a large new house in Shepparton and wanted to use as much of his solar generation as possible, rather than losing it to his retailer.

Watters Electrical solar sales team suggested a Redback 14kwh battery solution in a neat integrated cabinet with the solar inverter.

Watters Electrical solar experts installed 23 x 480w SunPower Performance range panels on the roof and a 14kwh Redback battery cabinet with a Redback inverter and PylonTech batteries in the garage.

The switchboard in the customer’s pantry was full, so our team fitted a second, seamless board above the existing one for the solar and battery.

The customer also took advantage of the Federal government STC incentive.

Solar Hardware Installed

  • 1x ST10000 3 phase Hybrid Battery Cabinet with Redback Inverter
  • 4x 3.5kwh PylonTech Batteries
  • 23x 480-Watt SunPower Performance Solar Panels

Extent of Works

  • Complete OH&S paperwork and submit safe work method statements for the site works. Submit Solar Pre-Approval documents to Powercor.
  • Supply & installation of approved solar panels, inverter and battery products.
  • Carry out site survey and locate all anchor points for safety harness. Install all mounting rails and bracket framing for solar panels.
  • Install cable tray and Photovoltaic panels at optimum angle.
  • Install solar inverters and Grid Protection Relay with Battery Cabinet.
  • Install new switchboard.
  • Carry out connections within switchboards & control cabinets.
  • Carry out final commissioning and shutdown procedure testing.
  • Arrange for solar system to be inspected by ESV inspector.
  • Complete paperwork and certificate of electrical safety.
  • Complete As-Installed drawing and Operation and Maintenance Manuals.
  • Submit all documents to Powercor for solar system connection grid.

Project Information

Project Year
2022

Project Type
Solar Installation & Battery System

Location
Shepparton, Australia