Shepparton Solar & Battery Installation
Shepparton Solar & Battery Installation
This customer was building a large new house in Shepparton and wanted to use as much of his solar generation as possible, rather than losing it to his retailer.
Watters Electrical solar sales team suggested a Redback 14kwh battery solution in a neat integrated cabinet with the solar inverter.
Watters Electrical solar experts installed 23 x 480w SunPower Performance range panels on the roof and a 14kwh Redback battery cabinet with a Redback inverter and PylonTech batteries in the garage.
The switchboard in the customer’s pantry was full, so our team fitted a second, seamless board above the existing one for the solar and battery.
The customer also took advantage of the Federal government STC incentive.
Solar Hardware Installed
- 1x ST10000 3 phase Hybrid Battery Cabinet with Redback Inverter
- 4x 3.5kwh PylonTech Batteries
- 23x 480-Watt SunPower Performance Solar Panels
Extent of Works
- Complete OH&S paperwork and submit safe work method statements for the site works. Submit Solar Pre-Approval documents to Powercor.
- Supply & installation of approved solar panels, inverter and battery products.
- Carry out site survey and locate all anchor points for safety harness. Install all mounting rails and bracket framing for solar panels.
- Install cable tray and Photovoltaic panels at optimum angle.
- Install solar inverters and Grid Protection Relay with Battery Cabinet.
- Install new switchboard.
- Carry out connections within switchboards & control cabinets.
- Carry out final commissioning and shutdown procedure testing.
- Arrange for solar system to be inspected by ESV inspector.
- Complete paperwork and certificate of electrical safety.
- Complete As-Installed drawing and Operation and Maintenance Manuals.
- Submit all documents to Powercor for solar system connection grid.