skip to Main Content

Iplex Albury

Iplex Albury Watters Slider 1
Iplex Albury Watters Slider 1
Iplex Albury Watters Slider 2
Iplex Albury Watters Slider 4
Iplex Albury Watters Slider 5
Iplex Albury Watters Slider 6
Iplex Albury Watters Slider 7
Iplex Albury Watters Slider 8
Iplex Albury Watters Slider 9
Iplex Albury Watters Slider 10
Iplex Albury Watters Slider 11
Iplex Albury Watters Slider 1Iplex Albury Watters Slider 2Iplex Albury Watters Slider 4Iplex Albury Watters Slider 5Iplex Albury Watters Slider 6Iplex Albury Watters Slider 7Iplex Albury Watters Slider 8Iplex Albury Watters Slider 9Iplex Albury Watters Slider 10Iplex Albury Watters Slider 11

Iplex Albury

The Project consisted in Relocating J-Well pelletizer from centre of factory to new location on side of shed to allow for new installation of Line 10 pipe extruder.

Installing new guards and fencing for J-Well pelletiser and upgrade safety control circuit.

Reconfiguring location of Zerma granulator to allow for new extruder line, the installation of a new gate safety key and lock system, with dual safety zones for operational setups.

Installing new pipe extruder line down the centre of the shed with central services tray and energy chain for moving vac tanks and spray tanks.

Electrical Hardware Installed

  • Cable & Ladder Trays
  • Energy Chain
  • Orange Circular cable
  • Control Cabling
  • Dekoron
  • Various items supplied by Iplex in the extruder and E11 panel

Project Information

Start Date
January 2021

Completion Date
Ongoing

Project Type
Industrial Installation

Location
Iplex Albury